Goldwater Lodge

Location:   Goldwater Lodge, Woking, GU21 3RT

Last updated:   10-01-2017

Generating capacity:   37 kWp

Total output to date:   72,180.55 kWh

Total CO2 saved to date:   38,183.51 kg

Weekly Solar Panel Output (kWh)

more info »

Weekly CO2 saved (kg)

more info »