Location: Quatermaine Ave, Woking, GU22 9NW
Last updated: 10-01-2017
Generating capacity: 20 kWp
Total output to date: 86,524.44 kWh
Total CO2 saved to date: 45,771.43 kg
Location: Quatermaine Ave, Woking, GU22 9NW
Last updated: 10-01-2017
Generating capacity: 20 kWp
Total output to date: 86,524.44 kWh
Total CO2 saved to date: 45,771.43 kg